Jiangyin Dingbo Technology CO., Ltd.

Jiangyin Dingbo Technology Co.Ltd. Professional in manufacturing roll forming machine

Manufacturer from China
Active Member
14 Years
Home / Products / Door Frame Roll Forming Machine /

Galvanized Metal Door Frame Roll Forming Machine With PLC Control System

Contact Now
Jiangyin Dingbo Technology CO., Ltd.
Province/State:jiangsu
Country/Region:china
Contact Person:MsEmma Teng
Contact Now

Galvanized Metal Door Frame Roll Forming Machine With PLC Control System

Ask Latest Price
Video Channel
Brand Name :Dingbo
Model Number :DBDF
Certification :ISO CE SGS
Place of Origin :Jiangsu, China
MOQ :1 set
Price :70000 USD/set
Payment Terms :L/C, T/T, Western Union, MoneyGram, D/A, D/P
Supply Ability :20 sets /month
Delivery Time :Shipped in 30-70 days after payment
Packaging Details :Export standard sea package with film and steel
Material :PPGI
Raw material :Steel coil
Roller material :45# Steel
Warranty :2 Years
Voltage :380V 50Hz
Control system :PLC ( Panasonic)
Production Capacity :10-15m/min
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Galvanized Metal Door Frame Roll Forming Machine For Customized

Product Features And Descriptions

Door frame roll forming machine production door frame is also known as door, usually consists of two vertical frames and upper frame.When the door is bright, there is a middle frame.

Door frame is the contact member of door fan, bright son and wall.



Working flow

Uncoiler--Feeding--Punching--Leveling--Roll-forming--Hydraulic-cutting--Output table


Product Parameters

Item NO

Description

Offered specification

1 Roll Forming Machine

Door frame

2 Coil width According the profile
3 Rolling Speed 12-15m/min(not include cutting & time)
4 Rolling Thickness 0.7-1.2mm GI
5 Control System PLC (Panasonic) as list in the note
6 Un Coiler 3T manual decoiler
7 Roller Stations About 18 stations (according the final design)
8 Roller Material 45# forge steel, coated with chrome
9 Shaft Material and DIA ¢65mm, material is 45# forge steel
10 Post cutting Hydraulic cutting after forming
11 Maim Motor Power 7.5kw
12 Hydraulic Station Power 5.5kw
13 Hydraulic Pressure 12-16Mpa adjustable
14 Material Of Cutting Cr12Mov quenching 58-62℃
15 Sturcture Of The Stations Wall panel
16 Tolerance 3m+-1.5mm
17 Electric Source

380V, 50HZ,3 phase

According to customer’s require

18 Way Of Drive By chain
19 Color Of The Machine Yellow and blue



Machine components


Decoiler,Punching-machine,Main forming machine,PLC control system,Hydraulic pump station,Post cutting,Electric motor,Output table


Picture

Galvanized Metal Door Frame Roll Forming Machine With PLC Control System


After sale services

1.Engineer will give free training lessons to labors in buyer’s factory.
2.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer per day.
3.During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4.We will charge the buyer cost price of spare parts beyond 2 years and provide long-term technical guide.



FAQ

1. Does one machine can only produce one size?
Not exactly, it depends on which profile the customer want to produce.
2.Do you have after-sales technical support?
Yes,we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
3. You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
4.How long the machine could be made?
Normally speaking, high precision roll forming machine could be made out with 40 working days.If you need machines in hurry, we can make it for you less than a month.
5. Do you provide customized?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.

6. May we visit your factory?
Sure,Warmly welcome to our factory at any time.
7.How to visit your factory?
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8.What's the warranty period?
12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.
9.Can we arrange shipment?
Yes, sure, we can arrange shipment for our customers and provide door-to-door service.

Best Regards
Andy Yang
Director
Mobile/Wechat/Skype:0086 139 2126 2246

Inquiry Cart 0