
Add to Cart
Professional Auto16 Stations Froming Stage Galvanized Steel Fire Damper Roll Forming Machine
Main features
Professional auto fire damper roll forming machine
Equipment Structure
This production line consists of Feeder/punching, roll forming, cutting,etc.
The production line is composed of de-coiler, punching, roll forming(welding) , cutting system , electric control system , etc.
Working flow
Decoiler---------leveling---------puncing-----roll forming--------cut to length----------output table
Technical parameters
Material of coil | Material Thickness | 1.5 mm galvanized coils |
Un Coiler | 3 tons manual | |
Forming system | Rolling Speed | About 10m/min |
Roller Stations | About 16 stations | |
Roller Material | Gcr15 coated with chrome | |
Shaft diameter | 65mm | |
Mai Motor Power | 18.5kw |
Machine components
No. | Name | Unit | Qty |
1 | Manual decoiler | set | 1 |
2 | Punching part | set | 1 |
3 | Main forming machine | set | 1 |
4 | PLC control system | set | 1 |
5 | Hydraulic pump station | set | 1 |
6 | Post cut | set | 1 |
7 | Electric motor | set | 1 |
8 | Output table | set | 1 |
Machine picture
FAQ
1. Does one machine can only produce one size?
Not exactly, it depends on which profile the customer want to produce.
2.Do you have after-sales technical support?
Yes,we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
3. You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
4.How long the machine could be made?
Normally speaking, high precision roll forming machine could be made out with 40 working days.If you need machines in hurry, we can make it for you less than a month.
5. Do you provide customized?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
6. May we visit your factory?
Sure,Warmly welcome to our factory at any time.
7.How to visit your factory?
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8.What's the warranty period?
12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.
9.Can we arrange shipment?
Yes, sure, we can arrange shipment for our customers and provide door-to-door service.
Best Regards
Andy Yang
Director
Mobile/Wechat/Skype:0086 139 2126 2246